TM 9-2320-365-20-3
7-3. ALTERNATOR BELTS REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Cab raised (TM 9-2320-365-10).
Air tanks drained (TM 9-2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Gage, Belt Tension (Item 16, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Personnel Required
(2)
CAUTION
Alternator belts must be replaced as a pair.
Failure to comply may result in damage to
equipment.
a. Removal.
(1) Disconnect air hose (1) from fan clutch (2).
(2) Loosen two screws (3) on front of engine block (4).
(3) Move tension bracket (5) up.
(4) Remove two alternator belts (6) from pulley (7).
Change 1
7-9