TM 9-2320-365-20-3
7-69. BATTERY TO SHUNT CABLE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Spare tire lowered (TM 9-2320-365-10).
Cab raised (TM 9-2320-365-10).
Batteries disconnected (para 7-48).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Materials/Parts
Lockwasher (Item 75, Appendix G)
a. Removal.
(1) Loosen clamp (1) on turbocharger intake hose (2).
(2) Remove turbocharger intake hose (2) from intake air
cleaner boot (3).
(3) Remove screw (4), lockwasher (5), and terminal lug
TL52 (6) from shunt (7). Discard lockwasher.
7-272