TM 9-2320-365-20-4
16-31. M1079 HEATER AND AIR CONDITIONER COVER REPLACEMENT
This task covers:
a. Heater Cover Removal
b. Heater Cover Installation
c. Air Conditioner Cover Removal
d. Air Conditioner Cover Installation
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
LH and RH doors opened (115 degrees) (TM 9-
2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Materials/Parts
Lockwasher (18) (Item 84, Appendix G)
Lockwasher (30) (Item 84, Appendix G)
Personnel Required
(2)
a. Heater Cover Removal.
NOTE
The following step requires the aid of an
assistant.
Remove 18 screws (1), lockwashers (2), washers (3), and
heater cover (4) from van body wall (5).
Discard
lockwashers.
b. Heater Cover Installation.
NOTE
The following step requires the aid of an
assistant.
Install heater cover (4) on van body wall (5) with 18
washers (3), lockwashers (2), and screws (1).
16-176