TM 9-2320-365-20-5
20-43. M1079 HEATER CONTROL CABLE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
AC power disconnected (TM 9-2320-365-10).
LH and RH doors opened (115 degrees) (TM 9-2320-
365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 21, Appendix D)
Lockwasher (18) (Item 92, Appendix G)
Personnel Required
(2)
a. Removal.
NOTE
Tag connectors and connection points prior
to disconnecting.
(1) Disconnect connector P244 (1) from heater connector
(2).
(2) Disconnect connector P245A (3) from heater control unit
(4).
(3) Remove 18 screws (5), lockwashers (6), washers (7),
heater deflector (8), and heater cover (9) from van body
wall (10). Discard lockwashers.
20-229