TM 9-2320-365-20-1
2-983
OPERATIONAL TEST
(1) Remove WTEC II relay SF02 (para 8-6).
(2) Install new WTEC II relay SF02 (para 8-6).
(3) Start engine (TM 9-2320-365-10).
(4) Position PTO switch to on
(TM 9-2320-365-10-1).
(5) If PTO operates, replace WTEC II relay SF02
(para 8-6).
(6) If PTO does not operate, replace WTEC II VIM
(para 8-6).