TM 9-2320-365-20-1
2-523
CONTINUITY TEST
CONTINUITY TEST
(1) Remove PDP cover (para 16-2).
(2) Remove relay K8 from PDP.
(3) Disconnect connector P12 (RH) or connector
P4 (LH) from housing.
(4) Set multimeter to ohms.
(5) Connect positive (+) probe of multimeter to
connector P12 (RH) or connector P4 (LH).
(6) Connect negative (-) probe of multimeter to
PDP, terminal 87A, where relay K8 was
removed and note reading on multimeter.
(7) If continuity is not present, go to step 5
of this fault.
(8) Connect connector P12 (RH) or connector
P5 (LH) to housing.
(1) Set multimeter to ohms
(2) Connect positive (+) probe of multimeter to
relay K8 terminal 87A.
(3) Connect negative (-) probe of multimeter to
relay K8 terminal 30 and note reading on
multimeter.
(4) If continuity is not present, replace relay K8
(para 7-9).
(5) If continuity is present, replace turn signal
switch (para 7-25).
(6) Install relay K8 in PDP.
(7) Install PDP cover (para 16-2).