TM 9-2320-365-20-2
2-1145
CONTINUITY TEST
(16) Install cover on 110/208 VAC POWER
DISTRIBUTION PANEL with six screws.
(17) Open door on 110/208 VAC POWER
DISTRIBUTION PANEL (TM 9-2320-365-10).
(18) Position circuit breaker CB1 to ON
(TM 9-2320-365-10).
(19) Close door on 110/208 VAC POWER
DISTRIBUTION PANEL (TM 9-2320-365-10).
(1) Loosen screw in terminal board TB3.
(2) Remove wire 3085B from terminal board
TB3.
(3) Set multimeter to ohms.
(4) Connect positive (+) probe of multimeter to
wire 3085B.
(5) Connect negative (-) probe of multimeter to
wire 3085AJ and note reading on
multimeter.
(6) If continuity is not present, repair or replace
wire 3085AJ from lighting fixture DS83 to DS82
(para 2-40).
(7) If continuity is present, replace lighting fixture
DS82 (para 16-59).
(8) Install ballast cover on lighting fixture DS82.
(9) Install two fluorescent lamps in lighting fixture
DS82.
(10) Install tube lock holder at each end of two
fluorescent lamps.
(11) Install diffuser on lighting fixture DS82.
(12) Install wire 3085B on terminal board TB3.
(13) Tighten screw in terminal board TB3.
(14) Install wire 1499K on terminal board TB4.
(15) Tighten screw in terminal board TB4.
