TM 9-2320-365-20-3
7-47. BATTERY BOX REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Batteries removed (para 7-46).
NATO power cable removed (para 7-63).
Wet tank removed (para 23-7).
Secondary and primary air tanks removed (para 11-
20).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Drill, Portable, Electric (Item 7, Appendix C)
Drill Set, Twist (Item 6, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Tool Kit, Blind Rivet (Item 43, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Wrench Set, Socket (Item 48, Appendix C)
Tools and Special Tools (Cont)
Wrench, Torque, 0-600 lb-ft (Item 59, Appendix
C)
Adapter, Socket Wrench (Item 1, Appendix C)
Materials/Parts
Lockwasher (2) (Item 85, Appendix G)
Nut, Self-Locking (4) (Item 144, Appendix G)
Washer, Flat (10) (Item 270.1, Appendix G)
Tape, Adhesive, Rubber (Item 72.1, Appendix
D)
Rivet, Blind (Item 223.1, Appendix G)
Rivet, Blind (Item 223.2, Appendix G)
Personnel Required
(3)
a. Removal.
(1) Remove 16 nuts (1), screws (2), and 32 washers (3)
from battery tray (4).
(2) Remove battery tray (4) from battery box (5).
(3) Deleted.
WARNING
Wear appropriate eye protection when
removing rivets. Failure to comply may
result in injury to personnel.
(3.1) Remove six rivets (6), washers (6.1), and two latches
(6.2) from battery box (5).
(3.2) Remove six band clamps (6.3) from battery box (5).
7-196
Change 1