TM 9-2320-365-20-3
7-49. AUXILIARY PANEL CABLE ASSEMBLY REPLACEMENT (ALL MODELS EXCEPT
M1079 W/O WINCH)
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Personnel heater removed (para 18-9).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 21, Appendix D)
Ties, Cable, Plastic (Item 76, Appendix D)
a. Removal.
NOTE
Remove plastic cable ties as required.
Tag wires and connection points prior to
disconnecting.
(1) Disconnect connector J108 (1) from connector P108 (2).
(2) Disconnect connector J210 (3) from connector P210 (4).
(3) Disconnect connector P913 (5) from connector J913 (6).
(4) Disconnect connector P912 (7) from connector J912 (8).
(5) Remove auxiliary panel cable assembly (9) from
dashboard (10).
7-205