TM 9-2320-365-20-5
20-69. 200 AMP TERMINAL BLOCK REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Spare tire lowered (TM 9-2320-365-10).
Batteries disconnected (para 7-48).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Materials/Parts
Ties, Cable, Plastic (Item 76, Appendix D)
Lockwasher (8) (Item 89, Appendix G)
Nut, Self-Locking (8) (Item 143, Appendix G)
a. Removal.
NOTE
Tag wires and connection points prior to
disconnecting.
Remove plastic cable ties as required.
(1) Remove nut (1), lockwasher (2), washer (3), and terminal
lugs TL171 (4) and TL61 (5) from terminal block terminal
(6). Discard lockwasher.
(2) Remove nut (1), lockwasher (2), washer (3), and terminal
lugs TL166 (7) and TL1 (8) from terminal block terminal
(9). Discard lockwasher.
20-407