TM 9-2320-365-20-5
20-84. M1078/M1081 S-280 SHELTER MODELS A, B, OR C TIEDOWN KIT
INSTALLATION/REMOVAL
This task covers:
a. Installation
b. Removal
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Cargo bed side panels and stakes removed (TM 9-
2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Sling, Cargo (2) (Item 31, Appendix C)
Materials/Parts
2x4x48 in. (122 cm) wooden piece (S-280
shelter models A o r B only)
Personnel Required
(2)
NOTE
This paragraph applies to shelter models A,
B, or C with an overall height of 83 1/2 to 89
in. (214 to 226 cm). If shelter height is below
83 1/2 in. (214 cm), shorten cable for proper
removal of slack in turnbuckle assembly.
a. Installation.
(1) Install four threaded blocks (1) in two tiedowns (2 and 3)
with four eyebolts (4).
Change 1
20-481