CONTINUITY TEST(8) If continuity is present, repair wire 1929from circuit breaker CB77 socket 5 on PDP toterminal board TB1 position 64 (para 2-40)or replace WTEC II dashboard cableassembly (para 7-10) or WTEC III dashboardcable assembly (para 7-11).(9) Install PDP on dashboard with three screws.(10) Install three washers and screws in PDP.(11) Install relay K11 in PDP.(12) Install PDP cover (para 16-2).Change 1 2-201TM 9-2320-365-20-1(1) Remove three screws and washers fromPDP.(2) Remove three screws from PDP.(3) Lift PDP outward to gain access.(4) Set multimeter to ohms.(5) Connect positive (+) probe of multimeterto relay K11 socket 30 on PDP.(6) Connect negative (-) probe of multimeter toterminal board TB1 position 64 on PDP andnote reading on multimeter.(7) If continuity is not present, repair wire 1658 from relay K11 socket 30 on PDP toterminal board TB1 position 64 (para 2-40) or replace WTEC II dashboard cable assembly (para 7-10) or WTEC III dashboard cable assembly (para 7-11).(13) Connect batteries (para 7-48).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business