TM 9-2320-365-20-1
2-507
CONTINUITY TEST
(1) Remove PDP cover (para 16-2).
(2) Remove relay K11 from PDP.
(3) Set multimeter to ohms.
(4) Connect positive (+) probe of multimeter to
PDP, terminal 85, where relay K11 was
removed.
(5) Connect negative (-) probe of multimeter to
PX7-23 and note reading on multimeter.
(6) If continuity is not present, repair wire 34A
(para 2-40) or replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III dashboard
cable assembly (para 7-11).
(7) Install relay K11 in PDP.
(8) Install PDP cover (para 16-2).
(9) Connect lighted indicator display to connector
PX7.
(10) Position lighted indicator display in instrument
panel assembly with four screws.
(11) Tighten four screws to 6-10 lb-in. (1 N·m).
(12) Connect batteries (para 7-48).