TM 9-2320-365-20-3
Section II. MAINTENANCE PROCEDURES
6-2. RADIATOR/CHARGE AIR COOLER REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Radiator fan shrouds removed (para 6-4).
Tools and Special Tools
Goggles, Industrial (Item 15, Appendix C)
Tool Kit, Genl Mech (Item 44, Appendix C)
Sling, Cargo (Item 31, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Adapter, Socket Wrench (Item 2, Appendix B)
Materials/Parts
Antiseize Compound (Item 63, Appendix D)
Lockwasher (6) (Item 91, Appendix G)
Nut, Self-Locking (4) (Item 140, Appendix G)
Grommet, Nonmetallic (Item 49, Appendix G)
Screw, Self-Locking (6) (Item 242, Appendix G)
Personnel Required
(2)
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
a. Removal.
(1) Disconnect air hose (1) from fitting (2).
(2) Remove fitting (2) from fan clutch assembly (3).
6-2
Change 1
