TM 9-2320-365-20-3
5-4. TAILPIPE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Tools and Special Tools
Goggles, Industrial (Item 15, Appendix C)
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 35, Appendix C)
Materials/Parts
Nut, Self-Locking (4) (Item 140, Appendix G)
Nut, Self-Locking (Item 119, Appendix G)
WARNING
Ensure exhaust system is cool before
performing maintenance.
Failure to
comply may result in injury to personnel.
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
a. Removal.
(1) Loosen hose clamp (1) on particle extraction hose (2).
(2) Remove particle extraction hose (2) from tailpipe (3).
5-13