TM 9-2320-365-20-3
7-6. AUXILIARY STARTER SOLENOID REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Batteries disconnected (para 7-48).
Cab raised (TM 9-2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 35, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 21, Appendix D)
Adhesive (Item 10, Appendix D)
Lockwasher (2) (Item 93, Appendix G)
Lockwasher (2) (Item 96, Appendix G)
Nut, Self-Locking (2) (Item 141, Appendix G)
a. Removal.
NOTE
Tag wires and connection points prior to
disconnecting.
(1) Remove adhesive, two nuts (1), lockwashers (2),
terminal lugs TL9 (3) and TL24 (4) from auxiliary starter
solenoid (5). Discard lockwashers.
(2) Remove adhesive, two nuts (6), lockwashers (7),
terminal lugs TL23 (8) and TL33 (9) from auxiliary starter
solenoid (5). Discard lockwashers.
7-21