TM 9-2320-365-20-3
7-53. CENTRAL TIRE INFLATION SYSTEM (CTIS) CABLE ASSEMBLY REPLACEMENT
(CONT)
c. Follow-On Maintenance.
(1) Install personnel heater (para 18-9).
(2) Install kick panel (para 16-3).
(3) Connect batteries (para 7-48).
(4) Start engine (TM 9-2320-365-10).
(5) Operate vehicle and check CTIS system for proper
operation (TM 9-2320-365-10).
(6) Shut down engine (TM 9-2320-365-10).
End of Task.
7-218