TM 9-2320-365-20-3
7-58. STE/ICE-R CABLE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Instrument panel assembly removed for access (para
7-15).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Materials/Parts
Ties, Cable, Plastic (Item 76, Appendix D)
Lockwasher (4) (Item 67, Appendix G)
a. Removal.
NOTE
Remove plastic cable ties as required.
(1) Disconnect connector J31X (1) from connector P31X (2).
(2) Disconnect connector J43X (3) from connector P43X (4).
(3) Remove two screws (5) and bracket (6) from cab (7).
7-240