TM 9-2320-365-20-3
7-59. CAB CLEARANCE MARKER LIGHTS CABLE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Batteries disconnected (para 7-48).
PDP cover removed (para 16-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Materials/Parts
Lockwasher (10) (Item 71, Appendix G)
Lockwasher (2) (Item 76, Appendix G)
Gasket (5) (Item 23, Appendix G)
Lockwire (Item 32, Appendix D)
a. Removal.
(1) Remove three screws (1) and washers (2) from PDP (3).
(2) Remove three screws (4) from PDP (3).
(3) Lift PDP (3) outward to gain access.
(4) Remove two nuts (5), lockwashers (6), washers (7), and
cover (8) from terminal board TB1 (9).
Discard
lockwashers.
(5) Disconnect terminal lug TL74 (10) from terminal board
TB1 (9) position 3.
(6) Disconnect terminal lug TL86 (11) from terminal board
TB2 (12) position 4.
Change 1
7-243