TM 9-2320-365-20-3
12-8. FRONT AXLE CENTRAL TIRE INFLATION SYSTEM (CTIS) QUICK RELEASE
VALVE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Air tanks drained (TM 9-2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape (Item
21, Appendix D)
Antiseize Compound (Item 63, Appendix D)
Nut, Self-Locking (2) (Item 148, Appendix G)
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
a. Removal.
NOTE
Tag air hoses and connection points before
disconnecting.
(1) Disconnect three air hoses (1) from quick release valve
(2).
(2) Remove two self-locking nuts (3) and washers (4) from
screws (5). Discard self-locking nuts.
(3) Remove two screws (5), washers (6), and quick release
valve (2) from frame (7).
Change 1
12-19