TM 9-2320-365-20-3
14-4. TAILLIGHT CARRIER REPLACEMENT
This task covers:
a. Left Taillight Carrier Removal
b. Left Taillight Carrier Installation
c. Right Taillight Carrier Removal
d. Right Taillight Carrier Installation
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Composite taillight assembly removed (para 7-32).
Backup light assembly removed (para 7-29).
Marker light assemblies removed (para 7-31).
Splash guards removed (para 16-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench Set, Socket (Item 49, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Wrench Set, Socket (Item 47, Appendix C)
Wrench, Torque, 0-600 lb-ft (Item 59, Appendix C)
Tools and Special Tools (Cont)
Wrench Set, Socket (Item 48, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix
C)
Materials/Parts
Nut, Self-locking (8) (Item 140, Appendix G)
Nut, Self-Locking (2) (Item 134, Appendix G)
Nut, Self-Locking (2) (Item 144, Appendix G)
Personnel Required
(2)
a. Left Taillight Carrier Removal.
(1) Remove two self-locking nuts (1), clamps (2), and
screws (3) from left taillight carrier (4). Discard self-
locking nuts.
(2) Remove two clamps (2) from rear lights cable assembly
(5).
(14-11 Blank)/14-12
Change 1