TM 9-2320-365-20-4
NOTE
Perform step (18) on left side (J236) outlet
box.
(18) Route wires 702E (11), 3085H (12), and 1499E (13)
through bottom of outlet box (24).
NOTE
Perform step (19) on right side (J237) outlet
box.
(19) Route wires 702E (11), 3085M (12), 1499C (13), and
702B (16) through bottom of outlet box (24).
NOTE
Left side and right side 24 vdc POS, NEG, and
GND binding posts are installed the same way.
Right side (J237) 24 vdc POS binding post
shown.
Perform steps (20) through (22) on 24 vdc POS,
NEG, and GND binding posts after installation of
outlet box.
(20) Install preformed packing (28), nylon washer (29),
preformed packing (30), and binding post (31) on cover
(32).
16-337