CONTINUITY TEST
CAUTION
(10) Connect batteries (para 7-48).
(11) Raise spare tire (TM 9-2320-365-10).
TM 9-2320-365-20-1
Change 1 2-275/(2-276 Blank)
All data on pages 2-276 thru 2-299,
including pages 2-277 thru 2-298, deleted.
(1) Set multimeter to ohms.
When testing to terminal X1 on PDP,
ensure that multimeter probes come in
contact with the outside metal ring.
Failure to comply may result in false
troubleshooting test results.
(2) Connect positive (+) probe of multimeter
to terminal X1 on PDP.
(3) Connect negative (-) probe of multimeter to
terminal lug TL44 and note reading on
multimeter.
(4) If continuity is not present, replace 200
AMP terminal block to PDP 24 VDC cable
(para 20-68).
(5) If continuity is present, replace 200 AMP
reverse polarity relay (para 20-58).
(6) Position terminal lug TL44 on left 24V
LOAD terminal stud on 200 AMP terminal
block with washer, lockwasher, and nut.
(7) Tighten nut to 15-19 lb-ft (21-25 N.m)
(8) Position dust boot on left 24V LOAD
terminal stud on 200 AMP terminal block.
(9) Install PDP cover (para 16-2).
