CONTINUITY TEST
(1) Loosen screw in terminal board TB3.
(2) Remove wire 3085K from terminal board
TB3.
(3) Set multimeter to ohms.
(4) Connect positive (+) probe of multimeter
to wire 3085K.
(5) Connect negative (-) probe of multimeter
to ground pole of 110 VAC receptacle
J232 and note reading on multimeter.
(6) If continuity is not present, repair or
replace wire 3085K (para 2-40).
(7) If continuity is present, repair or replace
wire 3085AA (para 2-40).
(8) Position wire 3085K on terminal board
TB3.
(9) Tighten screw in terminal board TB3.
(10) Position wire 1499B on terminal board
TB4.
(11) Tighten screw in terminal board TB4.
(12) Install cover on 110/208 VAC POWER
DISTRIBUTION PANEL with six screws.
(13) Install cover on 110 VAC outlet J232 with
screw.
(14) Connect AC power (TM 9-2320-365-10).
(15) Position circuit breaker CB1 to ON
(TM 9-2320-365-10).