TM 9-2320-365-20-3
7-4. ALTERNATOR BRACKETS REPLACEMENT
This task covers:
a. Support Brackets Removal
b. Support Brackets Installation
c. Belt Take-Up Bracket Removal
d. Belt Take-Up Bracket Installation
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
100 amp alternator removed, if equipped (para 7-2).
200 amp alternator removed, if equipped (para 20-56).
Tools and Special Tools
Goggles, Industrial (Item 15, Appendix C)
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Gage, Belt Tension (Item 16, Appendix B)
Material/Parts
Sealing Compound (Item 62, Appendix D)
Nut, Self-Locking (Item 148, Appendix G)
Personnel Required
(2)
a. Support Brackets Removal.
NOTE
Note location of different size screws for
installation.
(1) Remove two screws (1), washers (2), and belt adjusting
arm (3) from alternator bracket (4).
7-12