TM 9-2320-365-20-3
11-14. TWO-WAY CHECK VALVE REPLACEMENT (CONT)
(3) Position two-way check valve (2) on panel (3) with
washer (4), screw (5) and self-locking nut (7).
(4) Tighten self-locking nut (7) to 14-18 lb-ft (20-24 N·m).
(5) Connect three air hoses (8) to 90-degree fittings (1).
c. Follow-On Maintenance.
(1) Start engine (TM 9-2320-365-10).
(2) Check for air leaks around two-way check valve fittings
and air hoses.
(3) Shut down engine (TM 6-2320-365-10).
End of Task.
11-76 Change 1