TM 9-2320-365-20-4
16-43. M1079 VAN BODY FLOOR TAPPING PLATE INITIAL INSTALLATION (SERIAL
NUMBERS 001 THROUGH 190)
This task covers:
a. Floor Tapping Plate Initial Installation
b. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
LH and RH doors opened (115 degrees) (TM 9-2320-
365-10).
Any loose equipment removed (TM 9-2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Drill Set, Twist (Item 6, Appendix C)
Drill, Portable, Electric (Item 7, Appendix C)
Tool Kit, Blind Rivet (Item 43, Appendix C)
Materials/Parts
Nut, Blind Rivet (26) (Item 111, Appendix G)
Screw, Machine (26) (Item 240, Appendix G)
Sealing Compound (Item 67, Appendix D)
Personnel Required
(2)
a. Floor Tapping Plate Initial Installation.
(1) Measure and mark a line (1) on van body floor (2) from
van body front wall (3) to van body rear wall (4) 1/2 in.
(1.25 cm) from van body left side wall (5).
(2) Measure and mark a line (6) on van body floor (2) from
van body front wall (3) to van body rear wall (4) 17-11/16
in. (44.9 cm) from van body left side wall (5).
16-253