TM 9-2320-365-20-4
16-4. M1081 CAB ROOF REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Cab clearance lights removed (para 7-31).
Spare tire retainer and davit prepared for air drop (TM
9-2320-365-10).
Tools and Special Tools
Sling Assembly, Air Drop Roof (TM 9-2320-365-10).
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Screwdriver Attachment, Socket Wrench (Item 47.1,
Appendix B)
Dispenser, Sealant (Item 13.1, Appendix B)
Tools and Special Tools (Cont)
Screwdriver Attachment, Socket Wrench (Item
45, Appendix B)
Screwdriver Attachment, Socket Wrench (Item
50, Appendix B)
Material/Parts
Rubber Strip (Item 251, Appendix F)
Sealing Compound (Item 68.1, Appendix D)
Personnel Required
(2)
a. Removal.
WARNING
Cab roof weighs approximately 110 lbs (50
kgs). Attach a suitable lifting device prior
to removal. Failure to comply may result
in injury to personnel.
(1) Attach air drop roof sling assembly to cab roof (1).
(2) Remove four screws (2) and sun visor (3) from cab roof
(1).
16-8
Change 1
