TM 9-2320-365-20-5
b. Installation.
(1) Route 200 amp terminal block to reverse polarity relay
12 vdc battery cable (1) to rear side of front lifting beam
(2).
(2) Position terminal lug TL171 (3) on terminal block terminal
(4) with washer (5), lockwasher (6), and nut (7).
(3) Tighten nut (7) to 15-19 lb-ft (21-25 N·m).
NOTE
Install plastic cable ties as required.
(4) Install convoluted tubing (8) on 200 amp terminal block
to reverse polarity relay 12 vdc battery cable (1) and 200
amp terminal block to reverse polarity relay 12 vdc load
cable (9).
(5) Install dust boot (10) on 200 amp terminal block to
reverse polarity relay 12 vdc battery cable (1).
(6) Position terminal lug TL173 (11) on reverse polarity relay
12 VDC BAT terminal (12) with lockwasher (13), and nut
(14).
(7) Tighten nut (14) to 120 lb-in. (14 N·m).
(8) Position dust boot (10) on terminal lug TL173 (11).
20-395