TM 9-2320-365-20-5
20-67. 200 AMP TERMINAL BLOCK TO REVERSE POLARITY RELAY 24 VDC BATTERY
CABLE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Spare tire lowered (TM 9-2320-365-10).
Cab raised (TM 9-2320-365-10).
Batteries disconnected (para 7-48).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Materials/Parts
Ties, Cable, Plastic (Item 76, Appendix D)
Lockwasher (Item 92, Appendix G)
Lockwasher (Item 66, Appendix G)
a. Removal.
(1) Loosen clamp (1) on turbocharger intake hose (2).
(2) Remove turbocharger intake hose (2) from intake air
cleaner boot (3).
(3) Lift dust boot (4) on terminal lug TL169 (5).
NOTE
Remove plastic cable ties as required.
(4) Remove nut (6), lockwasher (7), and terminal lug TL169
(5) from reverse polarity relay 24 VDC BAT terminal (8).
Discard lockwasher.
(5) Remove dust boot (4) from 200 amp terminal block to
reverse polarity relay 24 vdc battery cable (9).
20-397
