CONTINUITY TEST
(1) Set multimeter to ohms.
(2) Connect positive (+) probe of multimeter to
relay K2 socket 86.
(3) Connect negative (-) probe of multimeter to
connector PX17 socket 1 and note reading
on multimeter.
(4) If continuity is not present, repair wire 1548
from relay K2 socket 86 to connector PX17
socket 5 (para 2-40) or replace WTEC II
dashboard cable assembly (para 7-10) or
WTEC III dashboard cable assembly (para
7-11).
(5) If continuity is present, repair wire 1586
from connector PX17 socket 5 to circuit
breaker CB70 socket 4 (para 2-40) or
replace WTEC II dashboard cable assembly
(para 7-10) or WTEC III dashboard cable
assembly (para 7-11).
(6) Install relay K2 on PDP.
(7) Install PDP cover on PDP (TM 9-2320-365-
10).
(8) Connect connector PX17 to master power
switch connector.
(9) Install instrument panel assembly (para
7-15).
Change 1 2-370.9
TM 9-2320-365-20-1