TM 9-2320-365-20-2
3-6. ENGINE AND TRANSMISSION OIL SAMPLING VALVES REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Cab raised (TM 9-2320-365-10).
Tools and Special Tools
Goggles, Industrial (Item 15, Appendix C)
Pan, Drain (Item 24, Appendix C)
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Wrench Set, Socket (Item 49, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 21, Appendix D)
Packing, Preformed (Item 166, Appendix G)
Antiseize Compound (Item 63, Appendix D)
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
a. Removal.
(1) Position drain pan under transmission oil sampling valve
(1) and engine oil sampling valve (2).
NOTE
Tag hoses and connection points prior to
disconnecting.
(2) Disconnect transmission oil sampling hose (3) from
transmission oil sampling valve (1).
(3) Disconnect engine oil sampling hose (4) from engine oil
sampling valve (2).
(4) Remove nut (5) and transmission oil sampling valve (1)
from bracket (6).
(5) Remove nut (7) and engine oil sampling valve (2) from
bracket (6).
Change 1
3-15
