TM 9-2320-365-20-3
7-76. POWER DISTRIBUTION PANEL (PDP) TO CAB GROUND CABLE REPLACEMENT
(CONT)
b. Installation.
NOTE
Install plastic cable ties as required.
(1) Install terminal lug TL57 (1) on grounding stud (2) with
lockwasher (3) and nut (4).
(2) Install wire 1623 (5) and terminal lug TL56 (6) on PDP
(7) with lockwasher (8) and screw (9).
(3) Install PDP (7) on dashboard (10) with three screws (11).
(4) Install three washers (12) and screws (13) in PDP (7).
c. Follow-On Maintenance.
(1) Install PDP cover (para 16-2).
(2) Connect batteries (para 7-48).
(3) Start engine (TM 9-2320-365-10).
(4) Check VOLTS gage for charge indication (TM 9-2320-
365-10).
(5) Shut down engine (TM 9-2320-365-10).
End of Task.
7-320