TM 9-2320-365-20-3
11-17. PARK CONTROL TWO-WAY CHECK VALVE REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Air tanks drained (TM 9-2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 21, Appendix D)
Antiseize Compound (Item 14, Appendix D)
Nut, Self-Locking (Item 148, Appendix G)
Lockwasher (4) (Item 90, Appendix G)
a. Removal.
(1) Remove two screws (1) and frequency ECU (2) from
bracket (3).
NOTE
Tag terminal lugs and connection points
prior to disconnecting.
(2) Remove nut (4), lockwasher (5), and terminal lug TL150
(6) from front brake air pressure transmitter terminal WK
(7). Discard lockwasher.
(3) Remove nut (8), lockwasher (9), and terminal lug TL156
(10) from front brake air pressure transmitter terminal G
(11). Discard lockwasher.
11-85