TM 9-2320-365-20-3
11-18. SYSTEM PARK AND TRAILER AIR SUPPLY VALVES REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-365-10).
Air tanks drained (TM 9-2320-365-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape (Item
21, Appendix D)
Antiseize Compound (Item 63, Appendix D)
a. Removal.
(1) Remove two roll pins (1) and knobs (2) from TRAILER
AIR SUPPLY valve (3) and SYSTEM PARK valve (4).
(2) Remove two nuts (5) from TRAILER AIR SUPPLY valve
(3) and SYSTEM PARK valve (4).
(3) Remove six screws (6) and panel (7) from personnel
heater assembly (8).
Change 1
11-91