TM 9-2320-365-20-5
20-54. 200 AMP ALTERNATOR KIT INSTALLATION
This task covers:
a. Installation
b. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
100 amp alternator removed (para 7-2).
100 amp reverse polarity relay removed (para 7-27).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 35, Appendix C)
Caps, Vise Jaw (Item 4, Appendix C)
Vise, Machinist (Item 46, Appendix C)
Materials/Parts
Ties, Cable, Plastic (Item 76, Appendix D)
Nut, Self-Locking (3) (Item 149, Appendix G)
Nut, Self-Locking (Item 137, Appendix G)
Nut, Self-Locking (M1081 only) (2) (Item 140,
Appendix G)
Washer, Spring (M1081 only) (2) (Item 280,
Appendix G)
Lockwasher (2) (Item 92, Appendix G)
Personnel Required
(2)
a. Installation.
NOTE
Retain
belt
adjusting
arm
for
future
installation.
(1) Removetwo screws (1),lockwashers (2),
and belt
adjusting arm (3) from alternator bracket (4) Discard
lockwashers.
(2) Position belt adjusting arm (5) on alternator bracket (4)
with two lockwashers (2) and screws (1).
(3) Tighten two screws (1) to 25-32 lb-ft (35-43 N·m).
(20-313 Blank)/20-314
Change 1