TM 9-2320-365-20-5
20-56. 200 AMP ALTERNATOR REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Batteries disconnected (para 7-48).
Alternator belts removed (para 7-3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 44, Appendix C)
Sling, Cargo (Item 31, Appendix C)
Vise, Machinist (Item 46, Appendix C)
Caps, Vise Jaw (Item 4, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 57, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 58, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
Materials/Parts
Dispenser, Pressure Sensitive Adhesive Tape
(Item 21, Appendix D)
Nut, Self-Locking (Item 137, Appendix G)
Personnel Required
(2)
a. Removal.
(1) Lift dust boot (1) on terminal lug TL6 (2).
(2) Remove nut (3), lockwasher (4), washer (5), terminal
lugs TL6 (2) and TL2 (6), and fuse link (7) from
alternator terminal (8).
(3) Position fuse link (7), washer (5), lockwasher (4), and nut
(3) on alternator terminal (8).
(4) Lift dust boot (9) on terminal lug TL60 (10).
(5) Remove nut (11), lockwasher (12), washer (13), and
terminal lug TL60 (10) from alternator terminal (14).
(6) Position washer (13), lockwasher (12) and nut (11) on
alternator terminal (14).
Change 1
20-349
